ATELIERSTUDIO ARH
Photovoltaic panels producing solar energy — illustrative stock photography

ATELIER STUDIO ARH · RENEWABLE ENERGY

A cleaner future.
A new source of energy.

Investing in the power of the sun. A photovoltaic project in Șomcuta Mare, supporting a low-carbon economy and a sustainable future.

Explore
PHOTOVOLTAIC POWER PLANT4.9 MW

Șomcuta Mare, Maramureș

Illustrative stock photography
4.9 MW

planned solar capacity

5,576.2 MWh

estimated average production / year

3,412.06 t CO₂

tonnes of CO₂ avoided / year

Financed by the Modernisation Fund1507 / 21.03.2026

01 / COMPANY

A responsible perspective
on development.

Based in Florești, Cluj County, Romania, ATELIER STUDIO ARH SRL is developing a renewable electricity generation project in Șomcuta Mare, Maramureș.

Investment in technologies with a lower environmental impact supports the company’s development direction. We aim to harness renewable energy potential through a solar project with indicators defined in the financing documentation.

Meet the company
Photovoltaic panels producing solar energy — illustrative stock photography
Investment in renewable energy
Illustrative stock photography

Company details

Company name
ATELIER STUDIO ARH SRL
Tax identification number
36869790
Trade Register
J2016004463123
Main activity
Electricity generation from renewable resources · CAEN 3512
Registered office
Str. Florilor nr. 178, bl. C2, ap. 59, Florești, jud. Cluj, România
Legal representative
Cozma Ionuț-Ciprian
Company registration certificatePDF in Romanian · 7.3 MB

02 / MODERNISATION FUND

Tomorrow’s energy,
built today.

ATELIER STUDIO ARH SRL signed financing agreement no. 1507/21.03.2026 for implementation of the project under Key Programme 1: Renewable energy sources and energy storage, call PFM/322/PFM_P1/NA.

View project details
Șomcuta Mare, MaramureșNorth-West Region, Romania
PHOTOVOLTAIC POWER PLANT01 — PFM
Planned installed capacity4.9 MW
Financing agreement1507 / 21.03.2026
Key Programme 1Renewable energy sources and energy storage

Project overview

Construction of a photovoltaic power plant, fencing, utility connections and construction site organisation

Project objective

Developing the company by increasing electricity production from renewable sources through new solar generation capacity. The project contributes to the objectives of Romania’s Integrated National Energy and Climate Plan and the Modernisation Fund.

The investment covers the photovoltaic power plant, fencing and electrical installations needed to connect it to the electricity transmission and distribution network.

Investment components

Photovoltaic power plant

Planned solar electricity generation capacity: 4.9 MW.

Șomcuta Mare, Maramureș

Fencing and site organisation

Works associated with delivering the investment.

Șomcuta Mare, Maramureș

Utility connections and grid connection

Electrical installations for connection to the electricity network.

Șomcuta Mare, Maramureș

Investment structure

Total project value27,505,061.79RON
Maximum financing from the Modernisation Fund4,382,040.60RON
Beneficiary contribution23,123,021.19RON

Maximum financing from the Modernisation Fund represents 40% of eligible expenditure and approximately 15.93% of the total project value.

Clear objectives. Measurable results.

The indicators below are project targets, not results already achieved.

01New installed capacity4.900 MWFMS04
02Average annual production5,576.200 MWh / yearFMS06
03Estimated annual emissions reduction3,412.060 t CO₂ / yearFMS05
04Capacity factor12.990 %FMS09
05Total production during the reference period111,524.000 MWhFMS07
Project activities
01

Preparation and procurement

Preparation of tender documents and delivery of contract award procedures.

02

Execution and monitoring

Execution and monitoring of the contracts required to implement the investment.

03

Management and audit

Project coordination and the associated financial audit.

04

Information and publicity

Implementation of the communication measures required by the financing agreement.

About the Modernisation Fund

Questions about the project?

For comments or questions about project implementation, contact us by phone or use the contact form.

03 / TRANSPARENCY

Open information.
Direct access.

Explore project information and published documents. Access is free, with no account or access approval required.

Document centre

LET’S KEEP IN TOUCH

Have questions?
Contact us.

Contact us

04 / NOTICES

Notices and updates.

Project notices and procurement announcements, together in one place.

Document centre

No notices have been published yet.

Notices about the project and procurement procedures will be available in this section.